Fixed wire testing for Kent premises
Commercial EICR in Kent
Due an electrical inspection? Arrange a commercial EICR with Upkeepone and plan the visit around your opening hours, staff and essential equipment.
From £170 + VATCovers inspection, testing and the report for up to five circuits.
Each further circuit costs £12.50 + VAT.
Qualified engineers, with NAPIT or NICEIC registration where applicable.
Enquiries across Kent and Medway, including Maidstone, Dartford, Canterbury and Ashford. Appointment options depend on your postcode and the work involved.
When is your inspection due?
Let us know which inspection or follow-up work you need. Add any report deadline or planned closure in the preferred dates field. You can choose “Not sure” and enquire without a circuit count. Fields marked * are required.
Documents and photographs can be sent to info@upkeepone.co.uk. Please use email for attachments; this form accepts text only.
Commercial electrical certificate quotations
Check the circuit count and the time needed on site
The five-circuit starting price gives you a basis for budgeting. A larger installation, extra distribution boards or restrictions on testing can require a different quotation. We check these details before agreeing the job.
Useful information includes the previous report, the approximate number of boards and whether the building has changed since its last inspection. You can still enquire if you do not know how many circuits there are.
Our main page explains the commercial EICR price calculation and inspection scope.
Fitting the inspection into the working day
Agree a time when the required testing can be carried out
Some electrical tests need the relevant circuits to be isolated. Explain which activities can pause, who can authorise that interruption and whether any equipment needs an organised shutdown or restart.
During normal opening hours
Identify a suitable period and the areas that will be occupied. A quiet shop floor does not necessarily mean that office systems, kitchen equipment or shared supplies can be switched off.
Before opening or after closing
An evening or early visit may suit the business, subject to engineer availability and the quotation. Arrange a responsible contact, building access and any security or permit requirements for the whole visit.
During a planned closure
If you have a maintenance day or a gap between bookings, give us the proposed window. Allow time for the inspection itself and discuss what happens if access problems or defects affect the programme.
From the enquiry to the visit
A simple plan for your site contact
1. Describe the building
Give the full address and any unit, floor or building reference. Mention separate workshops, storage buildings or outdoor supplies that you want included. An address alone may not identify the full installation.
2. Confirm the arrangements
Check the quotation, the intended inspection areas, permitted interruption times and who will meet the engineer. For gated sites or business parks, include the correct entrance, parking arrangements and any induction requirements.
3. Make the agreed areas accessible
Have the keys and existing records ready. Arrange access to rooms containing boards and make sure the person attending can reach the relevant controls safely. Only share photographs of closed boards or schedules you can reach without removing covers.
4. Agree who receives the findings
Identify the report recipient and anyone who needs to authorise follow-up work. Ask for the expected report-delivery arrangements before booking, particularly if a renewal, audit or insurer deadline is approaching.
After the inspection
Use the EICR to decide what needs attention
An Electrical Installation Condition Report records the assessed condition of the existing fixed wiring. Its inspection schedules, test results and observations need to be read alongside the stated extent and any limitations.
Check that the address, building references and inspected areas make sense to the person maintaining the property. A locked room or excluded supply should not disappear from the maintenance plan simply because a report has been issued.
Keep the EICR and any later investigation or repair documents together. They help a facilities team, landlord or subsequent contractor see what was found and what action followed.
Keeping inspections up to date
Review the next inspection date against current conditions
The previous EICR is a useful starting point for your maintenance programme. Consider its recommendations alongside the way the premises are used now, their condition and any alterations or additional equipment.
Workplace electrical duties under the Electricity at Work Regulations are about maintaining systems to prevent danger, so far as reasonably practicable. They do not impose an identical annual or five-year EICR timetable on every Kent business.
Ask a competent electrician to advise on the appropriate interval. Check any lease, insurance or sector requirements too. HSE’s workplace electrical safety guidance explains maintenance and competence; its Electricity at Work Regulations memorandum provides the detail.
Kent and Medway coverage
Send the full postcode so we can check attendance
Our Kent enquiry area includes Maidstone, Medway, Dartford and Gravesham; Sevenoaks, Tonbridge and Tunbridge Wells; and Canterbury, Ashford, Folkestone, Dover and Thanet. We also consider surrounding towns and villages. Include the site name where the postal address and entrance are different.
Kent is one of our priority areas for regular enquiries, together with London and Essex. Hertfordshire, Surrey, Buckinghamshire, Berkshire and Sussex are also covered. Other parts of the UK can be considered on request.
We assess attendance against the postcode, installation, access, travel and availability of an appropriately qualified engineer. Contact us with the actual site requirements so we can advise on suitable arrangements.
Questions about planning the work
Booking a commercial electrical inspection in Kent
Can the EICR be arranged during our maintenance shutdown?
What happens if a room cannot be opened on the day?
Can testing be spread over more than one visit?
Does an older distribution board automatically need replacing?
We have an unsatisfactory report from another firm. What should we send?
How can I compare two commercial EICR quotations?
Can I ask about emergency lighting or fire alarms at the same time?
For background on older installations and changing standards, read the IET’s explanation of Amendment 4.
Start planning your Kent electrical inspection
Send the property details and preferred dates. We will check what the inspection involves and discuss the next available options for your premises.
Updated 7 September 2026.